25 Mar Case Study: Waterproofing Radisson Blu Hotel, Upperhill, Nairobi by Mau West Company

The Challenge
The Radisson Blu Hotel in Upperhill, Nairobi, is a premium hospitality establishment with multiple wet areas critical to its operations, including the pool, bathrooms, laundries, retaining walls, water tank, planters, and a water feature. These areas are constantly exposed to water, making them highly susceptible to moisture infiltration, which can lead to:
- Structural damage due to water seepage into concrete and adjacent spaces.
- Mold and mildew growth, posing health risks to guests and staff.
- Aesthetic degradation, such as staining or peeling finishes, which could impact the hotel’s luxury appeal.
- Potential non-compliance with building regulations, risking safety and legal issues.
The challenge was to implement a robust waterproofing system that ensures long-term durability, functionality, and compliance while maintaining the hotel’s high aesthetic standards.
The Solution
Mau West Company, a trusted leader in waterproofing solutions, was engaged to address these challenges. Our approach included:
- High-Quality Waterproofing Product: We utilized Penetron Slurry ( https://waterproofing.mauwest.com/waterproofing-materials/penetron-crystalline-waterproofing-system/penetron/ designed for wet areas. These product is resistant to water pressure, chemical exposure (from cleaning agents in laundries), and environmental factors.
- Specialized Application:
- Pool and Water Feature: Applied Penetron slurry (https://waterproofing.mauwest.com/waterproofing-materials/penetron-crystalline-waterproofing-system/penetron/)to withstand constant water immersion and pressure.
- Bathrooms and Laundries: Used Penetron as well.
- Retaining Walls and Water Tank: Employed Penetron slurry
- On-Site Technical Application: Our team provided the application to ensure precision and adherence to building standards.
- Compliance and Testing: Post-application, we conducted rigorous water tests to confirm the integrity of the waterproofing systems, ensuring compliance with local regulations.
Results:
The waterproofing solutions implemented by Mau West Company delivered significant benefits to the Radisson Blu Hotel:
- Structural Integrity: The hotel’s critical areas are now protected from water seepage, preserving the building’s foundation and preventing costly repairs.
- Health and Safety: Mold and mildew risks have been eliminated, ensuring a safe environment for guests and staff.
- Aesthetic Preservation: The waterproofing systems maintain the hotel’s luxurious appearance by preventing water stains, cracks, and surface damage.
- Operational Efficiency: The laundries, pool, and water features function seamlessly without downtime caused by leaks or maintenance issues.
- Regulatory Compliance: The project meets all local building codes, ensuring the hotel’s long-term safety and legal standing.
- Client Satisfaction: The Radisson Blu Hotel management expressed satisfaction with the durability and performance of the waterproofing, reinforcing Mau West’s reputation as a reliable construction partner.
Mau West Company continues to support the Radisson Blu Hotel with ongoing maintenance advice, ensuring the longevity of the waterproofing systems.
For more information on our waterproofing solutions, contact us:
Email: info@mauwest.co.ke
Call: +254 721 766 847
Visit: KCB Building, Enterprise Road, Industrial Area, Nairobi
Mau West Company Ltd — Your Trusted Construction Partner.